Lytag : Drax Power Station

Lytag : Drax Power Station

The design and build of a new Lightweight Aggregate (LWA) plant for Lytag established at Drax Power Station to make use of the supply of Pulverised Fly Ash (PFA) which is the major constituent part of LWA.

A full turnkey project was delivered in less than 12 months allowing the sale of a range of graded LWA products.